We are about halfway through the second quarter- almost time for Lean Sensei's quarterly newsletter. If you are not on our mailing list, sign-up by emailing info@leansensei.com

Our newsletter includes lean advice rotating between our knowledgeable coaches, a feature highlighting a lean share from one of the many great organizations we have the honour of coaching, updates on upcoming programs and more.

Here is a past article by executive coach, Andrew on one of the fundamental concepts of lean, pull.


Pull What?

As any Greenbelt will tell you, PULL is about producing and supplying only what the customer needs. Pull remains the first and most powerful paradox in the Lean world. How can stopping and re-starting work possibly be more efficient than running flat out and using every drop of time available? Well, now we know that it is true—the minor time wastes of stopping and starting pale in comparison to the major wastes created by overproduction, excess inventory, obsolescence, and long lead times. Companies that truly practice PULL not only reduce inventory, they also create a framework for kaizen. When inefficiencies are not hidden by a sea of inventory, the logical thing to do is to shorten set-up times, reduce change-over times, build more flexibility into operating schedules, better manage staffing levels, cross-train people, and become more nimble as a supplier of goods or services. Operating a pull system means you need to build stability and predictability into your processes and your supply base, because you won’t be hiding behind a sea of inventory any more. In this way, Pull and Kaizen go hand-in-hand. The mechanics of pull are not all that difficult. Right? Well, we coaches see a lot of failed attempts, but there is always a silly deviation behind every failure. Failure is not a chance occurrence. Usually it is because of fruitless attempts to re-invent the wheel. You don’t gamble with the pull system. Unless you are running a job shop with inconsistent material inputs, you can make pull systems work for you. Please take advantage of the lessons learned when setting up your pull system. Use the LSI checksheet! It will guide you, like a ship’s compass to treasure island. Continuous improvement applies to pull systems as well. You need to revisit your pull system and make regular adjustments to ensure it is indeed pulling.

 

PULL Is the New JIT

One of the questions coaches often get asked when we talk about pull systems is what happened to Just In Time (JIT)? Is pull the same as JIT? Well, yes and no. Yes, JIT is about reducing inventory and having just what you need at a workplace. Back in the day, I was all over JIT. I saw the future and wanted to put JIT in place everywhere. I wanted to make change. They called me a JIT disturber. They said I had JIT for brains. They even called me a JIT head. I got over it. Much like the Lean world got over the word “JIT”, and replaced it with Pull or Replenishment. You see the problem with JIT as a Lean term is that it implies something arrives just in the knick of time. It confuses people because they might think there is nothing there; no inventory at all. Then, suddenly when it is time to start work, materials magically appear. We know that isn’t so. And good luck with trying this folly through Enterprise Resource Planning. So the real winners understand that Pull is best accomplished by replenishment. Never forget the ‘supermarket’ analogy. There is some product on the shelf, consumers take it and the stock level drops. Before the day is out, the stock gets replenished. So great pull is not really JIT. We now talk about Pull and Replenishment and Supermarkets and Kanban.


Kanban and Triggering Pulls

Which brings us to the final element of Pull systems—Kanban. OK, let’s get this straight. You pronounce it “Kahn Bahn”. Not “Can-Ban” (eeew, shudder). Now that we have that out of the way, let’s keep it simple. Kanban is simply a signal to replenish. Yes, we can add complicating factors like production kanban (signal to make stuff) and movement kanban (signal to move stuff) and internal kanban (signals that are only communicated within your company) and external kanban (signals that go to your suppliers or come from your customers). But the premise is all the same. We need a good clear signal: 1. What item is needed 2. What quantity it is needed in 3. Where to deliver it. That’s kanban. Keep it simple folks. Start with a simple 2-bin system where the value of parts are not in the top 20% of your spending, and get the flow going. Slowly expand to higher value items where more kanbans and smaller quantities can reduce overall inventory levels. Actively manage the number of kanbans for seasonal levels and major customer demand level changes. And where you can, attach the cards to the bins that hold the parts. Use “Bin-Ban” wherever you can. For suppliers, use “e-ban”, where you email the kanban signal to the supplier (unless you are using re-usable bins that go back and forth to the supplier). Get the mechanics of kanban working well, and you too will Pull ahead with your Lean program. So now we would like to Pull in some feedback and insights from you, our attentive audience. Go on and send in your thoughts and comments on Pull.

  -Coach Andrew.

Friday, May 16, 2014

Blackbelts, One Day Away From Graduation!

Yesterday, the Blackbelts presented their four month journey to complete their Blackbelt certification with Lean Sensei. Each presentation encapsulated their first Lean Assessment, providing diagnostic services to a local business in Vancouver and again at their home organization. Then the Blackbelts performed a major overhaul on the supply chain of a local company before flying halfway around the world to every lean practitioner's utopia... Japan.

Finally, the Blackbelts conducted an extreme makeover at a credit union.








But the program isn't over yet...today, the Blackbelts take their chances at Sensei's Den. Have a great long weekend Blackbelts, you've earned it!

Your last chance to get Lean Sensei Blackbelt certified is this fall:
Lean Strategy & Lean Assessment Module Sep 22-26
Lean Supply Chain Module Oct 20-24
Japan Lean Tour  (flights extra) Nov 17-20
Extreme Makeover Kaizen Module Dec 8-12

Register online to secure your spot: http://leansensei.com/register

Blackbelts having some fun on the water in the evening - part of teambuilding
























Thursday, May 15, 2014

Extreme Makeover!

This week the spring Blackbelts are completing their final week of their certification. The week opened with an extreme (lean) makeover at First West.

The group's mission was to achieve no less than 25% improvement. Below are photos from their report-out to stakeholders. No matter how much you've saved or how much you have improved a process, it doesn't do much if you cannot communicate it properly. Achievements are communicate to celebrate as a team and to keep the momentum for lean going.









Stay tuned for photos from the always entertaining and educational... Blackbelt presentations!

Wednesday, May 14, 2014

South for the Fall

This week, our Vancouver Greenbelts enjoyed a sunny start to their vigorous lean training. Imagine how sunny the start of our Orlando Greenbelts will be!

Lean Sensei is proud to bring lean to the sunny state of Florida. This fall we will go south. This Greenbelt program will be delivered in the fall on the following dates:

Module 1: September 15-19, 2014 | Introduction to Lean and 5S Kaizen
Module 2: October 13-17, 2014 | Cycle Time Reduction and Facilitation Skills
Module 3: November 10-14, 2014 | Lean Office, Final Presentations and Exam



Registration is now open. Go to http://leansensei.com/register to secure your spot.
Or contact us for more information 604-264-1000 | info@leansensei.com

Tuesday, May 13, 2014

Greenbelt Summer Kicks-off!

 
It was a sunny Greenbelt kick-off this week as the Summer Vancouver Greenbelts began their Lean journey.
 


Egg-drop activity:


 Hands-on Activities:


We wish you good luck!

Monday, May 12, 2014

Congratulations Greenbelt Toronto!

Congratulations to the Toronto graduating class of Spring 2014!
 
You can take a look at their kick-off blog post here.
 
Group photo:
 




 
Graduation Video:
 

Saturday, May 10, 2014

Europe Lean Tour Coming Up




While Lean Sensei is most known for its much-talked-about Japan Lean Tour program, did you know that we also conduct benchmarking trips to San Francisco, Florida, Germany, and Italy?  In fact, the Europe Lean Tour - which will tour Germany and Italy - is coming up next month.  The tour will visit some of the best lean factories in Europe, including BMW, Audi, Mercedes-Benz, Porsche, Lamborghini and even the million-dollar-plus, hand-crafted Pagani factory.

It's considered to be one of the most exclusive tours that we do, because we will have an access to some of the top lean talents in the world.

The Europe Lean Tour is also a "standard module" for our Master Blackbelt Program, and therefore two of the current Master Blackbelts will be travelling with us to Europe as well.

The special tour starts about a month from now on, so keep your eye on our blog for day-to-day updates.





















Wednesday, May 7, 2014

Chewing the Fat About Lean Production Processes

Below is an article that David wrote for Business in Vancouver, last year shortly before our lean conference, the Lean Summit.
Lean being ever-relevant, the article is still a good read and we hope you enjoy it.
Subscribe to our blog to get daily lean tips, or visit our website to learn more about our lean services.

Monday, May 5, 2014

Humans Steal Jobs From Robots at Toyota

 
The introduction of machines and robots have revolutionized the manufacturing world. It has enabled access to many goods that some people may not have been able to afford otherwise. The amount of "stuff" we can produce has increased dramatically because of machines. But we are reaching an age of going backwards in some sense. Backwards, in that as a society we are rediscovering the value of human touch, evident in the comeback of recognizing good craftsmanship, a characteristic luxury brands use to justify large price tags.

Lean philosophy applied at Toyota through reverence of kami-sama's (God in Japanese). In the past, only the most skilled craftsmen at Toyota would be referred to as kami-sama, an expression of the value Toyota placed on craftsmanship, quality and ingenuity. How can a machines that merely repeats the same task over and over again spawn innovation?

The following article showcases, Toyota's increased emphasis on refining the skills of craftsmen and cultivating an environment that condones innovation. The article is from Bloomsberg BusinessWeek, quoting from Toyota Motorcorp's, Mitsuru Kawai and Dr. Jeff Liker, a returning keynote speaker at Lean Sensei's lean conferences.

Stay tuned for more information on a smaller scale conference in November. In the meantime, we hope you are inspired by this article we are sharing with you.

'Gods' Make Comeback at Toyota as Humans Steal Jobs From Robots

Inside Toyota Motor Corp.’s oldest plant, there’s a corner where humans have taken over from robots in thwacking glowing lumps of metal into crankshafts. This is Mitsuru Kawai’s vision of the future.

“We need to become more solid and get back to basics, to sharpen our manual skills and further develop them,” said Kawai, a half century-long company veteran tapped by President Akio Toyoda to promote craftsmanship at Toyota’s plants. “When I was a novice, experienced masters used to be called gods, and they could make anything.”

These gods, or Kami-sama in Japanese, are making a comeback at Toyota, the company that long set the pace for manufacturing prowess in the auto industry and beyond. Toyota’s next step forward is counter-intuitive in an age of automation: Humans are taking the place of machines in plants across Japan so workers can develop new skills and figure out ways to improve production lines and the car-building process.

“Toyota views their people who work in a plant like this as craftsmen who need to continue to refine their art and skill level,” said Jeff Liker, who has written eight books on Toyota and visited Kawai last year. “In almost every company you would visit, the workers’ jobs are to feed parts into a machine and call somebody for help when it breaks down.”
The return of the Kami-sama is emblematic of how Toyoda, 57, is remaking the company founded by his grandfather as the CEO has pledged to tilt priorities back toward quality and efficiency from a growth mentality. He’s reining in expansion at the world’s-largest automaker with a three-year freeze on new car plants.

GM Recalls
The importance of following through on that push has been underscored by the millions of cars General Motors Co. has recalled for faulty ignition switches linked to 13 deaths.
“What Akio Toyoda feared the company lost when it was growing so fast was the time to struggle and learn,” said Liker, who met with Toyoda in November. “He felt Toyota got big-company disease and was too busy getting product out.”

While the freeze and spread of manual work may bear fruit in the long run, it could come at the expense of near-term sales growth and allow GM to Volkswagen AG challenge Toyota by deepening their foothold in markets such as China.

Toyota slipped 0.6 percent to 5,758 yen at the close of Tokyo trading, compared with the 1.6 percent decline by the benchmark Topix Index. The stock has fallen 10 percent this year.
The effort comes as Toyota overhauls vehicle development, where the world’s largest carmaker will shift to manufacturing platforms that could cut costs by 30 percent. It also underscores Toyota’s commitment to maintain annual production of 3 million vehicles in Japan.

100 Workspaces
Learning how to make car parts from scratch gives younger workers insights they otherwise wouldn’t get from picking parts from bins and conveyor belts, or pressing buttons on machines. At about 100 manual-intensive workspaces introduced over the last three years across Toyota’s factories in Japan, these lessons can then be applied to reprogram machines to cut down on waste and improve processes, Kawai said.

In an area Kawai directly supervises at the forging division of Toyota’s Honsha plant, workers twist, turn and hammer metal into crankshafts instead of using the typically automated process. Experiences there have led to innovations in reducing levels of scrap and shortening the production line 96 percent from its length three years ago.
Toyota has eliminated about 10 percent of material-related waste from building crankshafts at Honsha. Kawai said the aim is to apply those savings to the next-generation Prius hybrid.

Machine Masters  
The work extends beyond crankshafts. Kawai credits manual labor for helping workers at Honsha improve production of axle beams and cut the costs of making chassis parts.
Though Kawai doesn’t envision the day his employer will rid itself of robots -- 760 of them take part in 96 percent of the production process at its Motomachi plant in Japan -- he has introduced multiple lines dedicated to manual labor in each of Toyota’s factories in its home country, he said.
“We cannot simply depend on the machines that only repeat the same task over and over again,” Kawai said. “To be the master of the machine, you have to have the knowledge and the skills to teach the machine.”

Kawai, 65, started with Toyota during the era of Taiichi Ohno, the father of the Toyota Production System envied by the auto industry for decades with its combination of efficiency and quality. That means Kawai has been living most of his life adhering to principles of kaizen, or continuous improvement, and monozukuri, which translates to the art of making things.

Toyoda’s Test
“Fully automated machines don’t evolve on their own,” said Takahiro Fujimoto, a professor at the University of Tokyo’s Manufacturing Management Research Center. “Mechanization itself doesn’t harm, but sticking to a specific mechanization may lead to omission of kaizen and improvement.”
Toyoda turned to Kawai to replicate the atmosphere at Toyota’s Operations Management Consulting Division, established in 1970 by Ohno. Early in his career, Toyoda worked in the division, whose principles are now deployed at Toyota plants and its parts suppliers to reduce waste and educate employees.

Newcomers to the division such as Toyoda would be given three months to complete a project at, say, the loading docks of a parts supplier, which their direct boss could finish in three weeks, Liker said. The next higher up could figure out the solution in a matter of three days.
“But they wouldn’t tell him the answer,” Liker said of Toyoda’s time working within the division. “He had to struggle, and they’d give him three months. He told me that’s what he thought Toyota lost in that period of time when it was growing so fast. That was his main concern.”

Big Penalty 
During its rise to the top of the automotive industry -- Toyota has set a target for 2014 to sell more than 10 million vehicles, a milestone no automaker has ever crossed -- the company was increasing production at the turn of the century by more than half a million vehicles a year.
A year after the failure of Lehman Brothers Holdings Inc. in 2008 sent car demand tumbling, Toyota began recalling more than 10 million vehicles to fix problems linked to unintended acceleration, damaging its reputation for quality.

Last month, the company agreed to pay a record $1.2 billion penalty to end a probe by the U.S. Justice Department, which said Toyota had covered up information and misled the public at the time. Lawmakers are now considering fines and suggesting criminal penalties for companies after GM took more than a decade to disclose defects with its cars.
In the aftermath of its crisis, Toyoda has paused from announcing any new car-assembly plants as GM and VW push for further spending on new capacity.
In the years leading up to the recalls, Kawai had also been increasingly concerned Toyota was growing too fast, he said. One way for him to help prevent such a recurrence is to help humans keep tabs on the machines.

“If there is ever a technology that’s flawless and could always make perfect products, then we will be ready and willing to install that machine,” Kawai said. “There’s no machine that is eternally stable.”

Thursday, May 1, 2014

Problem Solving Out West

This week our Lean Duo, David and Jake are out west in corporate metropolis, Calgary to facilitate a Lean Problem Solving workshop.

David and Jake are at Devon, North America's largest processor of natural gas liquids. Like most companies going lean, Devon places importance on environmentally responsible business practices and supporting local communities.

Here are a few snapshots from today's session.







Contact us at 604-264-1000 or info@leansensei.com if you would like more information on setting up a customized in-house kaizen at your organization.

Wednesday, April 30, 2014

The Elevator Gang in Japan

Welcome back Blackbelts (aka Elevator gang?? Watch the video to find out)!

As the cherry blossom season has come to an end in Japan, so too has the Blackbelt's trip. However, there is no doubt that the memories and learnings will last. We hope you enjoy the movie summary below.

Blackbelt - Japan Lean Tour - Spring 2014 from Lean Sensei Leanbelt on Vimeo.

Registration for our last Japan benchmarking trip of the year is now open: http://leansensei.com/register

Dates: November 17-20, 2014

Tuesday, April 29, 2014

Illuminate the World

Lean equips every single employee with the tools to provide utmost value to the customer. Each and every member of the organization has the power to raise the level of quality your business delivers. Your business has the power to influence the lives of others.

Use your light to kindle not only your co-worker's light, but your friend, your sibling, your spouse's light and watch as the world around you illuminates.

Lean Sensei International
Go Transform the World

Monday, April 28, 2014

Lean Roots


Lean – Made in Japan, Born in the USA

We often associate Lean with everything that is good about Toyota or the Toyota Production System (TPS). For some of us, the mystique of Lean may even include all things from Japan and everything about the Japanese people. Looking back in time, however, many of the foundational principles of Lean were not so Asian and were actually born right here in our own backyard.

We know how Henry Ford’s assembly line or flow production transformed the manufacturing process and revolutionized transportation and the American industrial landscape. We also know of Edwards Deming’s “plan-do-check-act” and his teachings to Japanese managers during the post-war period.  Ford and Deming’s work had a significant impact on Japan’s reputation for producing innovative and high-quality products in the 60s and 70s. However, the most significant contribution to TPS that is rarely talked about these days may be The Training Within Industry or TWI service model which was created by the US Department of War, and ran from 1940-1945. The mandate of the TWI service was to provide consulting-style, train-the-trainer service to war-related industries in order to increase the production output to support the war effort. You can read Jim Huntzinger’s article The Roots of Lean[1] for an in-depth study on how TWI had such a profound influence on Lean as we know of it today.

The TWI service identified the Five Needs of the Supervisor:

1.    Knowledge of Work

2.    Knowledge of Responsibility

3.    Skill in Instructing

4.    Skill in Improving Methods

5.    Skill in Leading

These skills were taught to supervisors and experienced workers through training sessions which included:

1.    Job Instruction (JI) – Based on the credo: “If the worker hasn’t learned, the teacher hasn’t taught”

It provided guidelines for trainers to coach inexperienced workers so that they can work according to the standard.

2.    Job Methods (JM) – The underlying goal was to empower workers by having them evaluate their own jobs objectively and analytically on factors such as efficiency, safety, quality, quantity and cost.

3.    Job Relations (JR) – Provided guidelines for supervisors to handle workers fairly and with respect under the principle that “people must be treated as individuals.”

4.    Program Development (PD) – For trainers (Sensei) to continue training others to solve production problems.

The TWI program was well received in post-war Japan and formed the basis of the Kaizen and Standard Work culture in industry, particularly at Toyota. Harnessing this mindset and incorporating Taiichi Ohno’s Just-in-Time concept and Sakichi Toyoda’s principle of Jidoka are what resulted in today’s Toyota Production System and the Toyota Way.

I’m certain that there are some people who feel that it is difficult to become a Lean organization without having the “cultural roots of the Japanese” - well think again! For starters, many of the key components of Lean that are familiar to us such as Kaizen, Muda, Sensei, Gemba and JIT actually have their roots in North America - but were adopted, evolved, and improved in Japan.

In North America we tend to prefer controlling over engaging, commanding over coaching, adding/subtracting over improving, which makes the environment more difficult for lean. We’ve got let go of our need to control our people. Instead, engage them in making their jobs better through kaizens and develop them through proper coaching and mentoring. By making them part of the solution to the problem, the chances of a more effective sustainment will be much greater than if they were simply told how to fix it. This approach is the essence of TWI which played a significant role in the evolution of the problem solving and people developing culture at Toyota. And what are the results after just a few short decades? According to Fortune’s list, Toyota is the eight largest company in the world by revenue as well as the largest manufacturer in existence.

All this is not to say that we do not have great role models locally. Some exceptional organizations such as Medtronics or Dell Computers are present day manifestations of North America’s lean roots. Fortune magazine named Medtronics on their list of 100 Best Companies to Work For.  Access to some of Medronics’ best practices is accessible to you through Lean Sensei’s Florida Benchmarking tour. Of course you would have figured out by now that our Greenbelt and Blackbelt programs were designed many years ago based on the fundamental TWI principle of “train-the-trainer.”  The objective of these programs has always been the same: to prepare and develop people to become a true Sensei to others and eventually reach out to the entire globe.

Go Transform The World!

Coach Bob




[1] The Roots of Lean – Training Within Industry: The Origin of Japanese Management and Kaizen by Jim Huntzinger
http://twi-institute.com/assets/Uploads/Documents/articles/04-Roots-of-Lean-TWO-Origin-of-Kaizen.pdf

Friday, April 25, 2014

Inspiration is in the Cards


“Inspiration can come from the most unexpected places.” One needs only to google this truism to be barraged with overwhelming evidence, but I will add an example by relating my personal story below.

My particular “Eureka” moment happened on a lazy Sunday afternoon while my son Christopher was attempting to teach me and my wife the game of Pokémon. For those who may be unacquainted with this franchise, Pokémon (a contraction of “Pocket Monster”) is a very popular trading-card game that is based on the 1996 Pokémon GameBoy video game created by Satoshi Tajiri. As my son laboriously explained the general rules and subtle nuances of the card game, and I equally laboriously tried to understand said instructions, I suddenly recognized a similarity between elements of this game and project-related staffing challenges frequently faced at work.

For example:

·         In Pokémon, you are limited to the cards that are in your deck. At Alpha, we are limited to the staff comprising our development team.­

·         Prior to actual gameplay, players first need to construct their deck of cards, deciding which victory condition the deck will focus on to win the game, and how it will best achieve this success. At Alpha, we structure and staff our departments to support the planned development activities and overall long-term strategies of the business.

·         Individual cards contain relevant data for the specific Pokémon, such as types, strengths, weaknesses, energy, skill levels and compatibility with other types, just as individual development staff members have their own disciplines, strengths, weaknesses, special skills, experience and compatibilities.

·         When building a deck in Pokémon, players try to make the card types complement each other if possible; balancing their cards using synergies between the cards that will help each other – for example, Water and Electricity are good companions, as are Fire and Grass. At Alpha, we attempt to pair up team members that have demonstrated success when working together, as well as try to separate those who may not be so well-matched.

·         Pokémon players attempt to build a deck that will minimize weaknesses and maximize strengths. At Alpha, we try to assign team members to the types of projects they are best at, and strive to staff the project teams with an optimal mix of experience and skills.

·         And finally, in Pokémon, once you’ve played all the cards in your deck, the game is over – there are no more cards to play. At Alpha, once all the team members are assigned to their allotment of projects, there are no more resources available to take on new projects, at least in theory.

Although all of the above comparisons were interesting and hinted at potentially fun possibilities, it was that last bullet that excited me the most – the physical absoluteness of being out of cards – which I felt could really be exploited to the benefit of the organization. You see, like most corporations, Alpha was challenged by having more projects to work on than available resources to do the work. Also, like most corporations, it was very difficult to say “no” to a customer, and thus equally difficult for the development team to say “no” to a project without an impactful and unambiguous indicator of over capacity. I have always been a little jealous of the manufacturing side of the business, as they have a plethora of lean tools to implement in order to plan, pace, control and communicate. Manufacturing has the regular heartbeat established by Takt; the smoothing of production via the Heijunka box and Kanban cards; the stoppage of the line and signal of a problem triggered by the Andon cord. Where were all of the neat tools for the product development half of the business? Where were our Takt, Kanban, and Andon cords? We were being constantly pushed, where we would much prefer to pull.

Now, I suddenly found myself literally holding the answer in my hands with the Pokémon cards. If only these cards represented the various engineers, designers, program and product managers, testers, technicians, manufacturing and quality engineers, and other personnel that made up core project teams. I imagined dealing out project teams until all the cards were spent and my hands were empty – how much clearer and absolute of a signal could there be than that! I pictured the raw power of the senior management team having to physically pluck cards out of competing projects if they wanted to insert a new project, with the obvious impacts and implications immediately visible on-the-spot! My imagination was getting the best of me as I started to think of the possibilities. Could I incorporate individual career development onto the cards – training, skills assessment, experience level? Would an analog to purchasing a “booster deck” of Pokémon trading cards be the utilization of contractors, term employees and/or outsourcing? Would it be better to use actual photographs or more fun to come up with artistic renditions of team members? It was evident by this time that my mind was elsewhere and I wasn’t going to be a very fun Pokémon opponent, so I bribed my son with some PlayStation time and escaped to Staples and Canadian Tire for supplies.

The next day I shared the idea with the Leader of Continuous Improvement and Director of Program Management at Alpha. Both immediately saw the potential, so we started working on a conceptual prototype. Gradually, the initial card-based idea evolved and grew into a total visual resource management system including:

·         large whiteboard “spreadsheets;”

·         magnetic default project trays color-coded by product family and project complexity;

·         product family based decks of cards individually colour-coded by discipline;

·         transparent card-overlays for identifying lead engineers, unrequired team slots and understaffed conditions;

·         a quarterly calendar section;

·         and additional magnetic pieces for indicating important dates, project status and performance-bonus targets.

Since implementing the Engineering Pokémon board, we have witnessed a substantial decrease in the problems faced prior to implementation, including less shuffling of resources and priorities, fewer incidents of overloading or over-multitasking, and a near elimination of “under-the-table” or “back-door” projects. Additionally, the Engineering Pokémon board has become a show-piece for factory tours, as well as acting as the new “water cooler” in that small groups tend to coalesce around the board and discuss project-related issues. As my cubicle is just adjacent to the board, this has provided to me the added benefit of keeping a pulse on various programs and an early-warning-indicator of potential troubles brewing.

Insightful words from guest blogger, Steve. Read his bio below:

When Steven Pratt is not busy by being inspired by one of his six children, he spends his time as the Director of Engineering, Power Systems for Alpha Technologies Ltd (Alpha). Steve obtained a Bachelors and Masters of Mechanical Engineering from Stevens Institute of Technology, and holds over 40 issued patents. He is a registered Professional Engineer in the state of Florida, Motorola and ASQ certified Six Sigma Black Belt and has participated in numerous Lean Sensei facilitated in-house Lean training programs at Alpha. Steve has led and is heavily involved in internal kaizen projects. He has successfully applied Six Sigma and Lean tools and principals to enact positive change throughout his career.